SYNCLINE 2 HAUL ROAD OVERPASS
CLIENT
Hamersley Iron Pty Ltd
PROJECT
Syncline 2 Haul Road Overpass
LOCATION
Pilbara, WA
PROJECT DESCRIPTION
The scope of work comprises the earthworks, roadworks, drainage and construction of the Hall Road Overpass including:
- Construction of the OSOM bypass road
- Construction of foundations and footings for the overpass structure
- Supply, delivery to site, unloading and installation and backfill of the precast arch structure (101m length of 15m span, 7m rise)
- Construction of 440m of HME haul road embankment and pavement
- HME haul road pavement treatment with dust suppressants
- Supply and construction of surface water drainage including, CSP culverts, open drains and sediment ponds, rock lined batter chutes, rock armor and erosion protection
- Re-profiling of the NAR pavement, including bitumen and asphalt seals
- Supply and installation of line marking, road signage, guideposts, OSOM bypass gates and associated road furniture
- Development and rehabilitation of borrow and stockpile areas.