SYNCLINE 2 HAUL ROAD OVERPASS

CLIENT
Hamersley Iron Pty Ltd

PROJECT
Syncline 2 Haul Road Overpass

LOCATION
Pilbara, WA

 

 

 

 

 

 

PROJECT DESCRIPTION

The scope of work comprises the earthworks, roadworks, drainage and construction of the Hall Road Overpass including: 

  • Construction of the OSOM bypass road
  • Construction of foundations and footings for the overpass structure
  • Supply, delivery to site, unloading and installation and backfill of the precast arch structure (101m length of 15m span, 7m rise)
  • Construction of 440m of HME haul road embankment and pavement
  • HME haul road pavement treatment with dust suppressants
  • Supply and construction of surface water drainage including, CSP culverts, open drains and sediment ponds, rock lined batter chutes, rock armor and erosion protection
  • Re-profiling of the NAR pavement, including bitumen and asphalt seals
  • Supply and installation of line marking, road signage, guideposts, OSOM bypass gates and associated road furniture
  • Development and rehabilitation of borrow and stockpile areas.